New Avondale Brewing additions approved by Birmingham Design Review Committee

Reading time: 2 minutes

avondale
Cheers to that. (Jacob Blankenship / Bham Now)

Earlier this month, the Birmingham Design Review Committe (DRC) approved several improvements to Avondale Brewing Company’s campus in Avondale. Read on to get the details.

Additions to Avondale Brewing approved

Avondale Brewing Venue Enhancements from DRC meeting 12/27/2023Avondale Brewing Venue Enhancements from DRC meeting 12/27/2023
Move the slider from left to right to see the approved changes to Avondale Brewing. (Birmingham Design Review Committee)

During the December 13 meeting of the Birmingham DRC, Avondale Brewing finally secured approval of several enhancements to their brewery campus in Avondale.

According to Bruce Lanier—a Partner at ArchitectureWorks, the architecture firm hired by Avondale Brewing—the enhancements to Avondale Brewing include:

  • An elevated viewing platform, to serve as a premium ticketing option for concerts and events at the venue
  • An elevator to the second floor of the addition, to make it accessible by all guests
  • Installing a mesh screen and a sound barrier

“This is the second part of several venue enhancements we have been working on for Avondale Brewing Company. Essentially, the addition will be a two-story elevated viewing platform, with an elevator, that can serve as a premium ticketed space for the venue.”

Bruce Lanier, Partner, ArchitectureWorks

The new additions to Avondale Brewing will be wrapped in wood and steel material that complements the existing material throughout the brewery’s campus.

In order to make these enhancements, Avondale Brewing will remove the existing exterior bar, the bathroom entry canopy and brewing equipment.

Excited to see these additions made to Avondale Brewing? Tag us @bhamnow to let us know your thoughts!

Nathan Watson
Nathan Watson

Senior Content Producer + Photographer

Articles: 1100